Save Time and Money: Hard Chrome Plating in 10 Days
In food and dairy manufacturing, operational efficiency is everything. When a critical component like a scraped surface heat exchanger (SSHE) tube fails, the cost is measured not just in replacement parts, but in hours of devastating production downtime. For decades, plant managers have been forced to accept an unacceptable industry standard: commercial plating shops taking months to rechrome tubes, only to return them with inconsistent finishes, surface pitting, or dangerous cross-contamination risks.
It is time to stop settling for months of delay and substandard plating.
At Martin Brothers Inc., we built a permanent solution. We are proud to operate our brand-new, dedicated chroming and honing line, engineered from the ground up with one core mission: to provide the fastest, highest-quality scraped surface heat exchanger tube refurbishment in the world.
Why a Dedicated Chroming Line Beats the Competition
Traditional commercial plating shops juggle mixed automotive, general industrial, and commercial parts through the same baths. This creates a severe hidden danger: cross-contamination. Foreign metallic particles, chemical residues, and airborne debris embed into soft plating layers, putting food and dairy product safety at risk. Furthermore, shared shops lack the specialized focus needed for sanitary equipment.
Our facility operates entirely different:
-
100% Dedicated to Nickle Chrome Tubes/Barrels/Cylinders: Our chroming line is isolated exclusively for nickle chrome heat exchanger tubes. We completely eliminate the risk of cross-contamination from outside industrial sectors.
-
Advanced Multi-Stage Filtration: We maintain a strictly controlled environment and close system monitoring to eliminate foreign-material inclusions and ensure flawless plating adhesion.
-
Precision Specifications: Every tube undergoes rigorous multi-stage inspection, stripping, precision hard-plating to exact tolerances (0.003–0.005 inches per wall), and post-honing to a mirror sanitary finish that meets or exceeds OEM specifications.
Slash Your Wait from Months to Days: A Massive Money Saver
Waiting up to six months for essential equipment to return from a slow, shared plating shop forces plants to keep expensive backup inventory on hand or risk missing production quotas.
By bringing our dedicated line online, we have slashed standard turnaround times down to 10 business days from the moment your workpiece arrives. By shrinking your equipment downtime from months to days, your facility saves thousands of dollars in averted production halts while extending the operational lifespan of your existing capital equipment.
Ready to Outrun the Competition’s Delays?
Don’t let slow turnaround times put the brakes on your production schedule. Get your tubes serviced back to your plant in a fraction of the time. Call our team today for a quote.
Want to Explore Further?
Learn more information about the new dedicated chroming line from Martin Brothers Inc. at the link below.
